EU CBAM MRVFive sectors · one connected workflow
ISCF / EU CBAM MRV

Cement

One workspace for monitoring, raw-data Excel, calculations, evidence, reports and independent verification.

Choose a workflow stage
Installation → monitoring → raw data → calculations → quality → reports → verification

Select an authorised installation

Sign in to open your installation records and tools.

Sign in and continue
ISCF · DIGITAL MRV

Follow the clinker, explain the carbon

Keep process emissions, fuel and product boundaries visible.

Illustrative animation · no live sensor connection.

ISCF / CEMENT2026 · PROCESS ATLAS
12345678

Raw material preparation · Carbonates or clinker chemistry, kiln fuels, clinker output, dust returns

1 / 8

Educational route selection changes this illustration only; it does not change the installation’s monitoring profile or validate an unsupported route.

Interactive overviewSelect an authorised installation or engagement to see its records.
01 / WORKFLOW

Your next step, in context

Installation

Review company, installation, CN, reporting year and production boundaries.

Select an authorised installation or engagement before opening its data tools.

Open stage toolsStage guidance
2026 / METHODS & EVIDENCE

Process, calculation, certificates

Factory process map

Cement clinker

12345678
Raw material preparation

Carbonates or clinker chemistry, kiln fuels, clinker output, dust returns

An educational map of the selected route. Record the actual installation boundaries and measurements in its monitoring profile.

Emission calculation path
  1. Identify actual route, CN, boundary, measurement methods and functional unit.
  2. Reconcile activity records, process sources, electricity and relevant precursors.
  3. Apply the documented allocation and eligible heat / waste-gas adjustments; avoid double counting.
  4. Calculate embedded emissions on the applicable product basis and preserve the evidence trail.
E_fuel = activity × NCV × EF × oxidationSEE_g = (AttrEm_g + Σ relevant precursor emissions) / AL_g

Equations are an overview: units, conversion, attribution and sector-specific methods determine applicability.

Separate fuel and calcination emissions. Preserve clinker-content and functional-unit conversions.

Read complete 2026 guidance
CBAM certificates: operator to importer

The operator supplies emissions and SEFA evidence. The authorised EU declarant determines its obligation, purchase and surrender.

N_indicative = mass × max(0, SEE − FAA_per_t − eligible_reduction_per_t)

FAA depends on the applicable benchmark and precursor chain, the production-year CBAM factor and CSCF. Use the controlled estimator, including actual/default route conditions and evidence. A simple percentage of emissions is insufficient.

Open controlled operator estimatorFull free-allocation guidance
Complete Commission examples

Open the complete 2026 sector guidance at its worked examples. The document remains unchanged, including assumptions and limitations.

2026 worked examples — full source

2026 educational scenarios — ISCF adaptation

These are arithmetic reference cases, not complete monitored factory records or verified operator reports. Source-year changes and unresolved source-table issues are explicitly retained in the notes.

Grey Portland cement
Physical SEE tCO₂e/t
0.877080
Functional-unit SEE
0.923242
Functional unit
t_clinker

Unrounded electricity inputs explain minor differences from rounded published totals.

Full scenario inputs{ "sector": "cement", "reporting_year": 2026, "period_start": "2026-01-01", "period_end": "2026-12-31", "cn_code": "25232900", "production_t": 1321052.6315789474, "functional_quantity": 1255000, "functional_unit": "t_clinker", "nitrogen_fraction": 1, "clinker_ratio": 0.95, "boundary_id": "Educational Commission 2026 example", "allocation_basis": "Published example boundaries; arithmetic test only", "attributed_direct_tco2e": 0, "attributed_indirect_tco2e": 70293.2105263158, "precursors": [ { "cn_code": "25231000", "trace_id": "Commission 2026 guidance example", "origin": "EG", "source_period": "2026", "verified_status": "EDUCATIONAL_REFERENCE_NOT_VERIFIED_SUPPLIER", "functional_unit": "t_product", "mass_t": 1255000, "specific_direct_tco2e_per_t": 0.8265418326693227, "specific_indirect_tco2e_per_t": 0.04069 } ] }
Download all seven adapted scenarios

Historical 2024 workbooks remain original references, not relabelled 2026 calculations. Numerical engine coverage is documented separately.

All sources and version history
CBAM industrial illustration: Cement
EU CBAM MRV · ISCF

Cement

Monitoring · emissions · evidence · reporting