Cement
One workspace for monitoring, raw-data Excel, calculations, evidence, reports and independent verification.
Select an authorised installation
Sign in to open your installation records and tools.
Sign in and continueFollow the clinker, explain the carbon
Keep process emissions, fuel and product boundaries visible.
Illustrative animation · no live sensor connection.
Raw material preparation · Carbonates or clinker chemistry, kiln fuels, clinker output, dust returns
Educational route selection changes this illustration only; it does not change the installation’s monitoring profile or validate an unsupported route.
Your next step, in context
Installation
Review company, installation, CN, reporting year and production boundaries.
Select an authorised installation or engagement before opening its data tools.
Process, calculation, certificates
Factory process map
Cement clinker
Carbonates or clinker chemistry, kiln fuels, clinker output, dust returns
An educational map of the selected route. Record the actual installation boundaries and measurements in its monitoring profile.
Emission calculation path
- Identify actual route, CN, boundary, measurement methods and functional unit.
- Reconcile activity records, process sources, electricity and relevant precursors.
- Apply the documented allocation and eligible heat / waste-gas adjustments; avoid double counting.
- Calculate embedded emissions on the applicable product basis and preserve the evidence trail.
E_fuel = activity × NCV × EF × oxidationSEE_g = (AttrEm_g + Σ relevant precursor emissions) / AL_gEquations are an overview: units, conversion, attribution and sector-specific methods determine applicability.
Separate fuel and calcination emissions. Preserve clinker-content and functional-unit conversions.
Read complete 2026 guidanceCBAM certificates: operator to importer
The operator supplies emissions and SEFA evidence. The authorised EU declarant determines its obligation, purchase and surrender.
N_indicative = mass × max(0, SEE − FAA_per_t − eligible_reduction_per_t)FAA depends on the applicable benchmark and precursor chain, the production-year CBAM factor and CSCF. Use the controlled estimator, including actual/default route conditions and evidence. A simple percentage of emissions is insufficient.
Open controlled operator estimatorFull free-allocation guidanceComplete Commission examples
Open the complete 2026 sector guidance at its worked examples. The document remains unchanged, including assumptions and limitations.
2026 worked examples — full source2026 educational scenarios — ISCF adaptation
These are arithmetic reference cases, not complete monitored factory records or verified operator reports. Source-year changes and unresolved source-table issues are explicitly retained in the notes.
Grey Portland cement
- Physical SEE tCO₂e/t
- 0.877080
- Functional-unit SEE
- 0.923242
- Functional unit
- t_clinker
Unrounded electricity inputs explain minor differences from rounded published totals.
Full scenario inputs
{
"sector": "cement",
"reporting_year": 2026,
"period_start": "2026-01-01",
"period_end": "2026-12-31",
"cn_code": "25232900",
"production_t": 1321052.6315789474,
"functional_quantity": 1255000,
"functional_unit": "t_clinker",
"nitrogen_fraction": 1,
"clinker_ratio": 0.95,
"boundary_id": "Educational Commission 2026 example",
"allocation_basis": "Published example boundaries; arithmetic test only",
"attributed_direct_tco2e": 0,
"attributed_indirect_tco2e": 70293.2105263158,
"precursors": [
{
"cn_code": "25231000",
"trace_id": "Commission 2026 guidance example",
"origin": "EG",
"source_period": "2026",
"verified_status": "EDUCATIONAL_REFERENCE_NOT_VERIFIED_SUPPLIER",
"functional_unit": "t_product",
"mass_t": 1255000,
"specific_direct_tco2e_per_t": 0.8265418326693227,
"specific_indirect_tco2e_per_t": 0.04069
}
]
}Historical 2024 workbooks remain original references, not relabelled 2026 calculations. Numerical engine coverage is documented separately.
All sources and version history

